NEWS CENTER
NEWS > Project Information
Steel Structure Closure of Xi'an Xianyang International Airport T3A

Time:2010-08-09

On Aug.6, the steel construction of Xi’an Xianyang International Airport T3A undertaken by JG Steel Domestic Division is completed. We have finished the steel construction in two months, and is highly praised by the clients.

The project adopts the cone shape tree like steel column supports, wave hyperboloid truss shape, and advanced purline supporting system. We adopt advanced hoisting technique by mobile tower crane moving on the floor, greatly increasing the efficiency and reducing the cost,which showcases the construction conception of “technical innovation and green power”.
 



JINGGONG STEEL INTERNATIONALAug 9 ,2010


亚洲欧美日韩国产精品26u,videos欧美粗暴,中文字幕精品一区,日韩美乳诱惑专区 亚洲欧美日韩国产精品26u,videos欧美粗暴,中文字幕精品一区,91xav在线 亚洲欧美日韩国产精品26u,videos欧美粗暴,中文字幕精品一区,免费aa视频

127--------m.ms6677.com

316--------m.wexin120.com

805--------m.kuaibo66.com

472--------m.hfgcyq.net

318--------m.yzthzx.com